Asgard were awarded the second phase of this project in May 2015. Work com­menced on this 5720m2 project in July 2015. Asgard’s scope of works includes full design, procurement and installation of the Cleanroom Envelope. The AES panel system will be used in this project as it is the system specified by the client.

Ceilings – 5720m2 of AES system walk-on ceilings and bulkheads. Factory formed opes for lights and grilles.

Partitions – AES fully flush panelling system, 50mm thick to cleanrooms including 760Nr  fully flush windows, low-level return walls and cold weld joints. Fire rated plasterboard walls to electrical rooms.

Doorsets – Provision of 180Nr swing doors, 17Nr pass-through hatches.

Lighting – Supply and install  1050Nr LED light fittings including 245Nr emer­gency battery back-ups.

HVAC – Supply and installation of 578Nr HEPA filter housings, filter media and grilles.

Interlocking – Design, supply installation and commissioning of interlocking systems.

Bumprails – Provision of 1650m of wall mounted stainless steel bumprails.

Other items – Mock-up, 100Nr exit signs, 1280m of guardrails, 36Nr ladders and gates, 22Nr 316 grade s/s fire extinguisher cabinets.

  • Project Name: Regeneron Phase 2
  • Project Size: 5720m2
  • Project Value: €7million
  • Project Duration: July 2015 August 2016
  • Client: Regeneron Pharmaceuticals
  • Architect: Jacobs Engineering
  • Engineer: PM Group
  • Main Contractor: PM Group (Managing Contractor)

Outline Scope:

           AES System, 1.5kN Ceilings, Walls

           Doors, Interlocking & automation

           Pass-thru hatches, HEPA filters & housings

           Wall mounted bumprail

           LED walk-on lights, Guardrails & ladders

           Misc. Items

Design completed using:

           Autocad 2D

           Microstation

           Navisworks