This project commenced in September 2014. This Cleanroom was constructed within the existing building envelope and required on-going communication and coordination with the electrical, mechanical and sprinkler subcontractors and the client’s own personnel.

CeilingsDesign, manufacture and installation of 1,735m2 of 50mm thick aluminium honeycomb core panels with factory-formed opes where possible, including sub-grid.

PartitionsDesign, manufacture and installation of 1,120m2 of rockwool core cleanroom panels including a base and head track, airwalls and 25Nr glazed units.

DoorsetsProvision of 1ONr metal swing doors and 2Nr roller doors. Supply and installation of 2Nr emergency break-out panels.

InterlockingDesign, supply and installation of interlocking between roller doors and swing doors.

HVAC – Supply and installation of 66Nr terminal housing units.

LightingSupply and installation of 163Nr LED light fittings including 40Nr with battery back-up.

Other itemsSupply and installation of 6Nr pass thru hatches.

  • Project Name: Cleanroom 03 Project, Hol­lister
  • Project Size: 1735m2
  • Project Value: €852,000
  • Project Duration: September 2014 -March 2015
  • Client: Hollister ULC
  • Architect: Taylor Architects
  • Engineer: Concannon Healy Heffernan & RPS Group
  • Main Contractor: Purcell Construction Ltd
  • Outline Scope:

          Plasteurop System. Honeycomb core ceilings, Rockwool core walls

          Swing doors & RRDs

          Emergency break-out panels

          Terminal housing units

          LED Lights

          Pass-thru hatches

  • Design completed using: