GSK Hilo, Dungarvan, Ireland

Contract Summary

Asgard completed the design, supply and installation of this 2,000m2 Cleanroom over four levels, which included the high specification Cleanroom Envelope, with some Electrical elements, HVAC grilles, Structural elements, and fire rated walls to lift shafts. Cleanroom Envelope construction was completed in a very fast four month period from commencement of fit out.

Scope of works

  • Electrical – Design, supply and installation of recessed stainless steel service panels, automation of sliding and hinged doors and their interlocking.
  • Ceilings – 2,000m2 of FM walk on ceiling panels.
  • Partitions – 4,000m2 of flush metal faced fully flush panelling system 50mm thick
  • Doorsets – Provision of approx 70 doors including rapid action doors, harmetically sealed sliders, and various hinged doorsets.
  • Interlocking – Design, supply, installation and commissioning of interlocking systems.
  • Furniture – Design, manufacture and installation of various items of stainless steel furniture.